Substation civils and electrical balance of plant for a 19 X 3.3 MW windfarm including design installation and commissioning of a tail fed AIS 110kV switchyard and 100MVA 110/33kV transformer.
Project Scope
Design and Build contract for the engineering, procurement, construction and commissioning of electrical and civil works to all ERG and SONI functional specifications including;
- Substation civil works for SONI/NIE and customer 110/33kV AIS compound
- 110kV AIS bay
- 100MVA 110/33kV Transformer
- 8 panel 33kV ABB ZX 0.2 Switchboard
- HV system control, protection, metering, remote annunciation panels and battery systems
- 33kV collector circuit cabling and earthing counterpoise
- Fibre Optic network
- Complete commissioning of 110/33kV substation and HV cable circuits including VLF testing