Electrical Balance of Plant contract for 22 X 2.35MW turbine windfarm.
Project Scope
Design and Build contract for the engineering, procurement, construction and commissioning of electrical and civil works to all Enel and SPEN functional specifications including;
- 33kV ABB ZX0.2 Switchboard
- HV system control, protection, metering, remote annunciation panels and battery systems
- 33kV collector circuit cabling
- Fibre Optic network
- Complete commissioning of substation and HV cable circuits including VLF testing