Installation of a load management scheme across several substations to prevent the network operating above its thermal capacity due to embedded generation.
Project Scope
Load management scheme at Glenchamber substation, Tongland 132/33kV substation, Newton Stewart 132/33kV substation, Kendoon 132/33kV substation and Glenluce 132/33kV substations including;
- Installation of new control and protection panels
- Installation of new multicore cabling
- Complete end to end commissioning of the entire scheme