Electrical Balance of Plant contract for a 33kV connected windfarm consisting of 12 X 3MW GE Machines.
Project Scope
Design and Build contract for the engineering, procurement, construction and commissioning of electrical works to all Energia and NIE functional specifications including;
- 3 Panel 33kV Siemens NxPlus Switchboard
- Substation earthing and lightning protection
- HV system control, protection, metering, remote annunciation panels and battery systems
- Implementation of a full substation SCADA PLC system for client remote monitoring and control
- 33kV collector circuit cabling including Metmast
- Fibre Optic communications network for WTG’s and Metmast
- Full Substation Commissioning works including 33kV switchboard and protection relays
- Commissioning of 33kV collector circuit including VLF testing Fibre Optic OTDR
- Energisation of substation and collector circuit in line with GE and Energia