Obelisk Logo Mark Obelisk Logo Mark Obelisk Single About Icon Values Chevron Down Shape Play External Arrow Marker Phone Maximise Circle Minimise Circle Obelisk on LinkedIn

Power Systems Ballywater 110kV Cable Diversion

Installation, jointing and commissioning of 110kV and associated Fibre Optic cables to facilitate the construction of the new M11 motorway. 

Project Scope

Design and Build contract for the engineering, installation, jointing and commissioning of electrical works to all utility and BAM functional specifications including;

Connect with us