Scope: Installation of temporary Com’s tower trailers to support up to 9 number antennas and 3 number dishes at heights varying from 12m to 22m including enclosed cabin to house radio and transmission equipment.

Client: Vodafone and Hutchinson Whampoa Ireland for 2014

Location: Nationwide

Date: 2010 to present

Requirements: To install temporary towers for all Vodafone and Hutchinson temporary events such as open air concerts, Irish Open Golf, Tullamore show, Ploughing championships (largest open air agri-event in Europe – 120.000 people/day) etc

Solution: Obelisk is responsible for end to end delivery including site acquisition, deployment to site, erection of tower, installation and rigging of equipment, commissioning of all base stations (2/3/4G) and installation & commissioning of transmission equipment.

  • Project & programme management
  • Project Supervision Design Phase (Full PSDP)
  • Site Supervision
  • Project Supervision Construction Stage (Full PSCS)
  • Supply and install temp unit (12No units available ranging from 12m to 22m)
  • Civil works, if required.
  • Rigging of tower to client's specification and requirements.
  • Supply of full generator power for duration of event.
  • Installation and commissioning of transmission solution.
  • Commission of units for all operators, inc 2G, 3G, 4G, LTE etc
  • Derig/Decommission of entire unit once event is over.

Obelisk Impact: For 2014 Obelisk has deployed 24No temporary sites to 14No events over a 6 month period. Some of these events required the temporary site to be deployed at very short notice with Obelisk having the unit up and running within 72 hours. We also provide an emergency service for our clients to have these temporary sites deployed and in service within 72 hours if required.  Obelisk has delivered consistently on time and within budget to the highest quality and safety standards.