Woodhouse 80m Permanent Met Mast

Scope: Installation of foundations, supply and erection of 80m Met Tower and installation and commissioning of instruments and data logger equipment.

Client:Kirby Group

Location: Southern Ireland

Date: Sep 2014

Requirements: The customer needed a way to measure wind speed independently on-site to correlate the readings from the existing turbines. This enabled turbine performance checks.

Solution: Obelisk designed, supplied and installed a new 80m tower. Designed and installed foundations, erected tower, installed instruments, commissioned, handed over to customer.

  • Project & programme management
  • Design and fabrication of tower
  • Design and installation of foundations
  • Design and assembly of data logger system.
  • Site Supervision
  • PSCS Coordination (Project Supervisor, Construction Stage)
  • Civils works, including excavation and installation of concrete foundations
  • Tower erection,
  • Instrument installation and commissioning.

Obelisk Impact: The customer is now able to accurately monitor performance of the existing wind turbines in a timely manner, remotely and independently.